Please join us in Charlotte for another informative Cambi Academy.  This year we have presentations from Contractors, Owners and Cambi's technology directors.

We start with two presentations discussing two different delivery methods. Learn about Progressive Design Build and Fixed Bid Design Build for THP projects.

Trinity River Authority will be presenting on their 270 TDS/day system that currently is ramping up their digesters.

We conclude with a short presentation from our Technology Department discussing new products and developments.  We can't disclose this information, so you'll have to attend, in order to learn what's new and upcoming.
Location
The Westin Charlotte
601 College Street
Providence Ballroom 1


Date & Time
May 16, 2023

5:00 PM - 7:00 PM
Schedule
5:00 PM
PC Construction: Lessons learned from a Progressive Design-Build contract at the WSSC Piscataway Bioenergy Facility
Laura Simmers | Design-Build Process Manager    Robert Wierzbicki | Project Director  

PC has constructed two Cambi projects with a third project in early phase. DC Water was a fixed bid, design build project. The WSSC Bioenergy Facility is a progressive design build project. The presentation will look at how the PDB process worked and highlights the benefits of progressive design build for WSSC.

5:30 PM
KC Water:   Lessons learned from a Design-Build Contract at the Blue River Biosolids Facility
 Brent Herring | Deputy Director/Water & Wastewater Operations  

KC Water’s Blue River Wastewater Treatment Plant is undergoing a makeover. Once reconstructed, the facility will be renamed the Blue River Biosolids Facility. It will be the first plant of its kind in the Midwest to employ a Thermal Hydrolysis Process (THP). KC Water used a fixed bid Design-Build Contract (DB) for the work. Mr. Herring will discuss the details of the project with an emphasis on the reasons for using a DB approach. The facility is expected to be in service the second half of 2024.

6:00 PM
Trinity River Authority:  Constructing and Commissioning the first THP system in Texas
 Steven Daniels | Environmental Services Coordinator - Trinity River CRWS

The Trinity River Authority of Texas (TRA) embarked on an estimated $150 million construction phase at the 162 MGD Central Regional Wastewater System (CRWS) facility in Dallas. This project included the addition of thermal hydrolysis and anaerobic digestion to the solids process, which improved stabilization of biosolids, creating and increasing methane gas production and capture while reducing the quantity of biosolids disposed by more than half. The facility is running at approximately 50% capacity as they continue to ramp up the digestion process
6:30 PM
Options and New Developments for Cambi THP Systems
 Dr. Bill Barber – Technology Manager | Dr. Andreas Lilleboe – CTO Cambi AS

Whats new and upcoming for THP Systems.  Must attend to learn about the future for THP !
6:45 PM
Questions and Discussion 
 15 minutes for questions, answers and dynamic discussions.
7:00 PM
Reception 
 Please join us for food, refreshments
Location
The Westin Charlotte
601 South College Street
Located on across from the southwest corner of the Convention Center at the intersection of South College and East Brooklyn Village Blvd .
Join us on May 16
We look forward to hosting you!

Processing Registration...